Eric Hartwell's InfoDabble
Welcome to Eric Hartwell's InfoDabble
Sign in
|
Help
|
About
|
Site Map
Home
Blog
Wiki
Blog Archive
Photos
Tech Notes
Apollo 17: Blue Marble
Apollo 17 Flight Journal
LM
Calendars
About me
S/CAT Remembered
Manufacturing
Test
History
Missions
Systems
Photos
Controls
About
LM Manufacturing Pictures
Parts Manufacturing - Ascent Stage midsection engine decks being inspected after completion.
Mid section skins and lower deck assembly (LM-2) being aligned in welding fixture
Ascent Stage midsection structural with welded internal skin, lower deck and upper deck / docking tunnel
Machined forward bulkhead midsection to be joined to skins, decks and docking tunnel.
Machined aft bulkhead of Ascent Stage in midsection fixture with skins, decking and docking tunnel
Ascent Stage aft equipment bay is mounted
Ascent Stage -Front face fabrication of LM-2
Ascent Stage in final assembly fixture after addition of front face to center section and crew compartment.
Structural mid section Ascent Stage .
Structural Ascent Stage of (LM Test Article 8) LTA - 8
Ascent Stage pressure test LTA - 8
Structural Ascent Stage being delivered to final assembly Plant 5
Ascent Stage in Plant 5 work stand being assembled. Installation of electrical harnesses and plumbing lines - external skins are being check fitted
Descent Stage engine ring fabrication at Plant 2
First structural panels of Descent Stage cruciform being loaded onto the structural assembly fixture.
Descent Stage in structural support fixture prior to installation of detail parts cover assemblies and struts.
Descent Stage in workstand prep work prior to tank installation
Lunar Module SpaceCraft Assembly & Test - original photos and text by Frank A Pullo © 1997 FAP Systems Group All rights reserved.
Reposted with new material by
Eric Hartwell
licensed under the
Creative Commons Attribution-NonCommercial-ShareAlike 2.5 License
Site Map
About Me